Consistency: powder
Application temperature: +5°C to +35°C
Filling joints after installation
– on walls: 4-8 hours
– on the floor: 24 hours
Waiting time before cleaning the cladding: 10-20 minutes
Light walking allowed: after 24 hours
Commissioning: after 7 days
Bending strength after 28 days, MPa: > 6
Compressive strength after 28 days, MPa: > 25
Consumption: depending on the width of the seam